1. Basic Concept
Once an order is booked at a POS location, the POS cannot process the order independently in the New ERP.
The POS can only assign the order to an authorised workshop. The authorised workshop is responsible for processing the order and sending the completed job back to the POS.
Core Logic
The primary reason for this workflow is that uncut lens inventory is not maintained under POS inventory. Therefore:
- POS cannot directly allocate uncut lens stock to an order.
- POS cannot assign uncut lens stock to an order from its own inventory.
- Locations holding uncut lens inventory are therefore mapped/created as Virtual Workshops in the ERP.
- The workshop acts as the inventory and processing location for the required lens/material.
2. Standard Order Processing Flow
The standard flow should be:
- 1Order Booked at POS
- 2Order Assigned to Workshop
- 3Material Sent from POS to Workshop (Frame / Lens / Required Material)
- 4Final Dispatch from POS
- 5Workshop Receives the Order
- 6Workshop Receives the Material
- 7Workshop Processing Options Become Available
- 8Job Completed
- 9Workshop Sends Completed Job Back to POS
- 10Final Dispatch from Workshop
- 11POS Receives the Completed Job
- 12POS Raises Invoice
Important Note on Final Dispatch
Final Dispatch is a critical step in the entire process.
Even if the POS and Workshop are physically located at the same premises, the ERP treats them as two separate locations. Therefore, whenever material/job movement takes place between POS and Workshop, the system must record the movement through Final Dispatch.
Without Final Dispatch, the receiving location will not be able to identify or receive the material/job in the ERP.
3. Workshop Processing Scenarios
Once the workshop receives the order and material, the workshop may process the order through any of the following methods:
3.1 Workshop Uses Its Own Inventory
The workshop can use available uncut lens stock from its own inventory to fulfil the order.
Flow: Workshop Inventory β Lens Allocation β Processing β Completed Job β POS
3.2 Workshop Purchases Lens Directly from Vendor
The workshop can raise a Purchase Order (PO) to an authorised vendor for the required lens.
Flow: Workshop β PO to Vendor β Vendor Supplies Lens β Workshop β Processing β POS
3.3 Workshop Requests Lens from HO / Another Workshop
The workshop can raise a request/PO to HO or another authorised workshop for the required uncut lens.
Flow: Workshop β Request/PO β HO/Other Workshop β Lens Supply β Workshop β Processing β POS
3.4 Workshop Raises a Job Order to Vendor
The workshop can raise a Job Order where the external vendor is responsible for:
- Supplying the required lens
- Edging
- Fitting
- Returning the completed job to the workshop
Flow: Workshop β Job Order β Vendor β Lens Supply + Edging + Fitting β Completed Job β Workshop β POS
3.5 Workshop Performs Edging & Fitting Internally
The workshop may perform the edging and fitting using its own employees/equipment.
Flow: Workshop Material β Internal Edging & Fitting β Completed Job β POS
3.6 Workshop Uses an External Vendor for Edging & Fitting
The workshop may send the received material/job to an external vendor specifically for edging and fitting.
Flow: Workshop β External Vendor β Edging & Fitting β Workshop β POS
3.7 Workshop Transfers the Job to Another Workshop
If a workshop cannot complete the fitting/processing, it can transfer the job to another authorised workshop.
Flow: Workshop A β Job Transfer β Workshop B β Processing β Workshop A/POS
The required material movement must also be recorded correctly in the ERP.
4. Critical ERP Checks & Process Rules
The following points must be strictly followed while processing an order in the ERP.
4.1 Material Send & Final Dispatch are Mandatory for Edging/Fitting
Before a workshop can perform edging and fitting, the POS must:
- Send the required material to the workshop.
- Complete Final Dispatch.
The workshop cannot perform the edging/fitting process unless the required material has been received in the workshop.
Reason: The ERP validates the physical/material location. If the frame/material has not been received by the workshop, the system assumes the workshop does not have the material; therefore, the workshop cannot perform the edging/fitting process.
4.2 Lens-Only Transfer
When one workshop requests an uncut lens from another workshop, the user performing the Job Assign/Transfer must ensure that only the "Lens" checkbox is selected.
This is important because the transfer is for the lens/material only and not for the complete job/material set.
4.3 Material Receipt Before Job Transfer
If a workshop needs to:
- Transfer the job to another workshop, or
- Send the job to an external vendor for complete processing,
the workshop must first receive the material from the originating store/location.
Required Sequence: Store/POS β Material Send β Final Dispatch β Workshop Receive β Material Receive β Job Transfer / Vendor Processing
A workshop should not transfer or send the job for further processing before the required material has been properly received in the ERP.
5. Key Principle
The entire workflow is based on one fundamental ERP principle. Therefore, every movement of material between POS, Workshop, HO, another Workshop, or Vendor must be properly recorded through the applicable Send β Final Dispatch β Receive process.
This ensures that:
- Inventory remains accurate.
- The workshop can access the required processing options.
- Material location is correctly reflected in the ERP.
- Jobs can be transferred between locations without process interruption.
- POS can receive the completed job and raise the invoice correctly.